Exchange: Planning and Environment Linkages (PEL)
Draft Proceedings
Figure 2.
CDOT
PEL
Process Flowchart
Extended Description
← Return to report
Figure 2. CDOT PEL Process Flowchart
The image above contains two flowcharts.
1. A bidirectional flowchart with three elements:
- Agency/Stakeholder/Public Input
- Collect Baseline Traffic and Environmental Data
- Process Documentation
2. A flowchart flowing in one direction from System Planning (MPO/TRP Regional Plans) to System Planning (MPO/TRP Regional Plans). The steps in the flowchart are reproduced in the list below:
- Identify Transportation Needs
- Determine Reason for PEL Study and Desired Outcome (FHWA
Coordination Point)
- Identify Stakeholders
- Define Roles and Responsibilities (Charter Agreement)
- Define and Refine Travel Corridor (Logical Termini)
- Develop Purpose and Need, Goals, and Objectives (FHWA Coordination Point)
- Develop Performance Measures (Evaluation Criteria)
- Develop Alternatives and Define Travel Modes
- Evaluate and Screen Alternatives and Identify Environmental Impacts and Potential Mitigation (Eliminate Unreasonable Alternatives) (FHWA Coordination Point)
- Document Evaluation Process (What/Why Alternatives Strategies Were Screened Out)
- Finalize Planning and Environmental Linkages Document (FHWA Coordination Point)